“This year, the road was opened by the PWD for vehicular traffic on June 26, after clearing the heavy snow from both sides from Bhagotu towards Saach Pass and from Satrundi to Saach Pass. Again the bus service between Chamba and Bhagotu was introduced from June 30.On transit shipment basis, two light vehicles (maxi cabs) of the HRTC carry the bus passengers from Bhagotu to Killar through the 30 km jeepable stretch between Bhagotu and Killar.”


